Skip to content

Custom welded structures

We manufacture welded structures in a single plant in Lodz, from cutting to 3D inspection. We weld manually and on FANUC robots, from one-off parts to series, including machine structure components as well as new railway vehicle assemblies and parts.

The welding certificates were issued by TÜV Rheinland Polska, and ISO 9001 by LL-C (Certification). Click a document to open the PDF; certificate numbers are listed in the certificate table.

Welder in an air-fed helmet stands at a perforated welding table, welding a bent sheet metal part; the arc lights up the inside of the part in blue.
Manual welding of a bent sheet metal part. ECAD shop floor.
Yellow robotic welding arm with a torch and cable.
Robotic welding arm with a torch.
Welder in a checked shirt and helmet welds a vertical metal sheet set on a perforated welding table; sparks fly around the weld area.
Welding sheet metal on a perforated welding table. ECAD shop floor.
Worker with a welding helmet raised on his forehead cleans sheet metal with non-woven abrasive; machine shop floor in the background.
Cleaning sheet metal with non-woven abrasive.
Detail of an assembly drawing of a welding fixture: clamps and blocks on a plate, with circular callouts showing item numbers and quantities.
Welding fixture with clamps and item numbers. Drawing from an ECAD project.

Welding certificates: rail and machine structures

The EN 15085-2 certificate (classification level CL 2, activity P, manufacturing) covers new assemblies and parts for railway vehicles. When an order requires other processes, materials or thicknesses, we extend the scope per order with Welding Procedure Specifications (WPS) and Welding Procedure Qualification Records (WPQR). The EN ISO 3834-2 certificate confirms welding by methods 135 (MAG) and 141 (TIG) in the production of machine structure components as well as railway vehicles and their parts. See railway welding to EN 15085-2.

  • EN ISO 3834-2 certificate for ECAD, page one. Open PDF, 0.7 MB.
    EN ISO 3834-2valid until 24.09.2030
    EN ISO 3834-2:2021 Comprehensive quality requirements for fusion welding. Methods 135 (MAG) and 141 (TIG). TÜV Rheinland Polskano. 01 8610 PL/A-250054.00 Validity period:25.09.2025–24.09.2030
  • EN 15085-2 certificate, level CL 2, for ECAD, page one. Open PDF, 1.0 MB.
    EN 15085-2valid until 24.08.2028
    EN 15085-2:2020+A1:2023 Welding of railway vehicles: CL 2, activity P. Scope extended per order. TÜV Rheinland Polskano. TUVRh/15085/CL2/PL019/25 Validity period:25.08.2025–24.08.2028
  • ISO 9001:2015 certificate for ECAD, page one. Open PDF, 0.2 MB.
    ISO 9001valid until 24.02.2028
    ISO 9001:2015 Quality management system: metal forming and machining of metal parts, machine design and machine building. LL-C (Certification) Czech Republic a.s.no. 4803131 Validity period:25.02.2025–24.02.2028

TÜV Rheinland Polska certificates can be verified with the issuing body, and EN 15085-2 also in the ECWRV register (en15085.joincert.eu). ISO 9001 can be checked via LL-C (ll-c.net/verification) using code 1DE0AD39-BA4. All documents, including ISO 14001: ECAD certificates.

  1. Manual welding on CUBE tables and robotic welding on FANUC units

    We weld manually across three bays equipped with in-house designed CUBE welding tables (separate brand CUBEWELD, modular welding table system at cubeweld.pl). We weld stainless steel and aluminium in a dedicated bay. We also weld on two FANUC welding robots. Whether your part is welded robotically or manually is determined at the quote stage. We use Kemppi power sources, and for thin sheet metal and welds that are to remain visible without grinding, we also use a laser: see laser welding.

  2. Pre-welding: cutting and bending of parts

    We cut sheet metal with an HSG G3015H V2 fibre laser, by waterjet on a PTV machine or with oxy-plasma on a STIGAL cutter, and bend it on a Trumpf TruBend 7050 press brake. We bend tubes and profiles on a VLB EB53CNC-RH CNC mandrel tube bender. See laser cutting, sheet metal bending and tube and profile bending.

  3. Post-welding: annealing, machining and 3D inspection

    The finished structure can undergo stress-relief annealing in a furnace with a 1000 × 1200 × 800 mm chamber, be finished by CNC milling or surface grinding, and have its dimensions checked with a Scantech 3D scanner and a Mitutoyo height gauge. Whether the structure fits in the furnace and on the machine is verified at the quote stage.

  4. No assembly drawing? Our design office will prepare it

    Our design office will prepare the 3D model and documentation for the welded structure. For example: a welding fixture with clamps, an assembly drawing with item numbers. In the same way, we design and build steel stairs and platforms, most often machine access platforms.

  • Drawing close-up: toggle clamp with handle bolted to the fixture plate, next to a stop block.
    Close-up: toggle clamp on a workstation table plate.
  • Section A-A of a tank: walls, flanged cover and four nozzles with diameter dimensions, valves at the bottom.
    Section A-A of a stainless steel tank. From our design office.

Stainless steel and aluminium at a separate workstation

We manufacture welded structures from structural steel, stainless steel, aluminium and other metals to order. We weld stainless steel and aluminium at a separate workstation.

Our EN ISO 3834-2 certificate covers material groups 1.1, 1.2 and 8.1 according to ISO/TR 15608, which includes austenitic stainless steels with Cr ≤ 19%. Aluminium is not within the current scope of our certificates, but we do weld it. When an order requires a certified welding procedure, we extend our scope with new WPS and WPQR.

Specify the material and grade in your enquiry; we will confirm them when preparing the quote. See stainless steel and aluminium welding.

What to send for a welded structure quote

We quote welded structures on the basis of an assembly drawing or 3D model, not from a price list. See also: what determines the price of cutting and bending.

The order price depends on:

  • material and its grade
  • number of components and welds
  • dimensions of the structure (for annealing: whether it fits in the 1000 × 1200 × 800 mm furnace chamber)
  • cutting and bending of components prior to welding
  • weld and welding documentation requirements
  • quantity
  • lead time

Prefer to call? +48 697 270 000 (Mon–Fri 8:00–16:00)

Prefer e-mail? biuro@ecad.com.pl

  1. Send an assembly drawing or 3D modelPDF, DXF, DWG, STEP, IGES, photos (JPG, PNG, TIFF) or a ZIP or 7Z archive. Up to 10 files, up to 100 MB in total.
  2. Describe your orderMaterial, number of components and quantity, dimensions of the structure, weld and documentation requirements, standard (if required by the order) and lead time.
  3. We will reply with any questionsWe will review your submission and let you know what additional details we need.
Send your drawing for a quote

We process the data from your enquiry in accordance with our privacy policy.

Questions about welded structures

What are welded structures?

A welded structure is an assembly of sheet metal, tube and profile components joined by welds into a single unit, such as a steel machine frame. We manufacture such structures at a single plant at Elektronowa 6 in Lodz, from cutting through to 3D inspection.

What is the minimum order quantity for a welded structure?

From a single piece to series production.

What materials do you weld structures from?

From structural steel, stainless steel, aluminium and other metals to order. Specify the material and grade in your enquiry; we will confirm them when preparing the quote. See stainless steel and aluminium welding.

Can you manufacture a welded structure for the rail industry?

Yes. We hold an EN 15085-2 certificate, certification level CL 2, activity type P: production of new welded assemblies and parts for rail vehicles. See welding for the rail industry according to EN 15085-2.

How large can a structure be for stress-relief annealing?

Our stress-relief annealing furnace chamber measures 1000 × 1200 × 800 mm. We will check whether your structure fits when preparing the quote.

How much does it cost to manufacture a welded structure?

We do not have a price list. We prepare quotes on the basis of an assembly drawing or 3D model; the price depends on the material, number of components and welds, dimensions, quantity and lead time.

Related services

Do you have a drawing or 3D model of a structure?

Send an assembly drawing or 3D model. We will outline how we will execute your order: cutting, bending, welding, annealing and 3D inspection. For rail industry orders, specify which standard is required.

Send your drawing for a quote